* Attempt the Quiz only once .
* Score will be released only after closing of the quiz .
* If total marks scored is above 40% of the maximum marks , then E- certificate will be emailed immediately . Or in 2minutes
* Only 100 E – certificates will be emailed per day .
K.V.N Mallikharjuna Rao
HOD, Civil Engineering
RISE Krishna Sai Gandhi Group of Institutions, Ongole
Mr. L Venkata Nagaraja
Coordinator, Assistant Professor/CE
RISE Krishna Sai Gandhi Group of Institutions, Ongole
* Link to Apply / attempt the Quiz :
E QUIZ
It Consists of 10 Questions. Answer all the Questions
- Which of the following significant about an arrow in the network diagram?*
Lenght
Direction
Shape
None of the above
- The A-O-N (Activity on Node network system) is preferred over a A-O-A system because*
It allows efficient use of dummy activities
It does not contain activity times
It does not allow dummy activities
It allows revisions and modifications easily
- In a PERT analysis, duration of activity is taken as*
Optimistic time
Pessimistic time
Most likely time
Expected mean time
- Bar charts are suitable for*
Major projects only
Minor projects only
Medium projects only
Any project
- If optimistic time, most likely time and pessimistic time of an activity are 4,5 and 6days respectively, then the expected time of activity will be*
4 days
5 days
9 days
15 days
- In a CPM network the activity is non critical if*
EST = LST and EFT = LFT
EST < LST and EFT < LFT
EST > LST and EFT > LFT
EST < LST and EFT > LFT
- The independent float affects*
Preceding activities
Succeeding activities
The particular activity involved
All the activities
- The direct cost of a project with respect to normal time is*
Minimum
Maximum
Zero
Infinite
- The Resource Allocation and Multi-project Scheduling is a techniques of*
PERT
CPM
CPS
Network Analysis
- The demand of amount deposited with tender is called*
Tender money
Caution money
Security money
Earnest money